1. When installing, pay attention that the arrow on the valve body should be consistent with the flow direction of the medium. Do not install in a place where there is direct dripping or splashing water. The solenoid valve should be installed vertically upwards;

2. The solenoid valve should be guaranteed to work normally within the 15%-10% fluctuation range of the rated voltage of the power supply voltage;

3. After the solenoid valve is installed, there must be no reverse pressure difference in the pipeline. And it needs to be energized several times to make it suitable for temperature before it can be put into use;

4. The pipeline should be thoroughly cleaned before installation of the solenoid valve. The medium should be free of impurities. Install a filter before the valve;

5. When the solenoid valve fails or is cleaned, a bypass device should be installed to ensure that the system continues to run.

 